Power play 2 starts

7:39 AM Posted by ukmad

After some Dharnas and protests by the Weavers from Belgaum HESCOM has now been able to get 80MW of electricity for Belgaum and hence the load shedding will be for 4 hours.

There will be only 4 hours load shedding from 9am to 1pm in the city areas. Industrial areas the load shedding timing will be from 6pm to 10 pm. 10pm to 6 am there will be un disclosed power cuts in the industrial areas. The weavers will face the power cuts from 4pm to 8pm.

Rural areas will still face 10-14 hours power cuts.

0 comments:

Post a Comment